Exteriors

Exteriors

Enhancing your home’s curb appeal and functionality with expert exterior renovations, using high-quality materials to create striking, durable, and energy-efficient transformations.
At Landis, our exterior remodeling services are dedicated to enhancing the curb appeal and functionality of your home. We specialize in transforming facades, updating siding, and installing new windows and doors to refresh and modernize your exterior. From sophisticated updates to classic revamps, our expert team ensures every element complements your home’s unique character. With meticulous attention to detail and high-quality materials, we create striking exteriors that not only elevate your home’s appearance but also improve its durability and energy efficiency.

Uniquely Landis

With over 30 years of experience in the Washington, DC market, Landis Architects | Builders offers a comprehensive design-build solution that combines architectural excellence, skilled craftsmanship, and personalized service.
In-House Expertise
Streamlined Process and Efficiency
Quality and Craftsmanship
Client-Centric Approach

How long does a typical Exteriors project last?

While each project is unique, there are some typical times to expect for your general design and construction schedule.

Consultation

1 - 2 Weeks

First, our team leader will review your goals and present a design proposal. The design cost is generally eight to ten percent of your construction estimate.

Initial Design Review

2 - 4 Months

Next, our designers will ask about your overall goals for the home, including whether the renovation will cover both the interior and exterior. They will also inquire about your preferences for an open plan, the number of bedrooms and bathrooms needed, and if new windows and doors are required.

Schematic Design

1 - 3 Months.

At this stage, we’ll measure your house to create as-built drawings to launch the design. We will review pros and cons of different layouts and options. Depending on the complexity of the desired design, we’ll create 3D renderings to help you visualize the changes. Finalizing the overall design may take one or two meetings. Once final, we will provide a targeted construction estimate.

Design Development

2 - 4 Months

Our designers will propose selections based on your inspirations. Cabinetry is the main selection that sets the stage. Other key selections that contribute to a cohesive look: appliances, countertops, backsplash, faucet, sink, lighting, and cabinet hardware.

Permitting and Approvals

2 - 4 Months

As you finalize selections, our designer will be creating construction drawings to submit for a building permit. In D.C., the submission and approval process can take several months (it is a little shorter in Maryland and Virginia).

Construction ( Typical )

3 - 8 Months

Once we secure the permit, we will start demolition and move into framing, plumbing, electrical, drywall etc. The punch list of small items is the last segment. The timeline to completion depends on structural complexity and if an addition is involved. After that, you will be enjoying your beautifully renovated home.

Total Project Time : 7-16

7 - 16 Months

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ita enim vivunt quidam, ut eorum vita refellatur oratio. Nam quid possumus facere melius.

See Our Latest Projects.

At Landis we don’t just follow trends, we establish them. Learn more about our Exteriors projects.
Inspiration Gallery
No items found.

FAQs

How Should I Pay for My Renovation?
How Long Does a Renovation Take?
What is Design Build?
What Permits Will My Project Need?
What Will My Project Cost?
Let's start the conversation.
Your Dream Renovation Awaits – Talk to Our Team of Experts Today!
Ready to start your project?
Let's talk.